STC SA00160LA
FAA DRS lists SA00160LA as Current · Reissued, held by IKHANA Group Inc., for Viking Air DHC-6-100, Viking Air DHC-6-200, and Viking Air DHC-6-300. Recorded change: Installation of IKHANA Aircraft Services wing box assembly. Snapshot dated June 30, 2026.
Recorded modification
What the FAA record covers
Installation of IKHANA Aircraft Services wing box assembly.
SA00160LA identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.
Applicability
Aircraft named in FAA DRS
Named aircraft: Viking Air DHC-6-100, Viking Air DHC-6-200, and Viking Air DHC-6-300. Confirm the approved model list, serial effectivity, configuration, and certificate revision.
Buyer checks
Confirm before sourcing
- 01Does it cover the exact Viking Air DHC-6-100 and Viking Air DHC-6-200, and 1 more aircraft configuration model, serial range, and configuration?
- 02Which configuration, loads, materials, inspections, and damage limits apply?
- 03Who can legally supply the design data, kit, instructions, and ICAs?
- 04What parts, labor, conformity, and return-to-service work are excluded?
Related aircraft structures STCs
Installation of wing leading edge cuffs and vertical stabilizer vortex generators.
FAA holder: Curry Aviation LLC
Installation of wing leading edge cuffs and vortex generators on vertical stabilizer.
FAA holder: Curry Aviation LLC
Installation of wing leading edge cuffs and drooped tips.
FAA holder: Curry Aviation LLC