STC SA00160LA
Recorded change: Installation of IKHANA Aircraft Services wing box assembly. FAA DRS lists SA00160LA as Current 路 Reissued, held by IKHANA Group Inc., for Viking Air DHC-6-100, Viking Air DHC-6-200, and Viking Air DHC-6-300. Snapshot dated June 30, 2026.
Recorded modification
What the FAA record covers
SA00160LA identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.
Applicability
Aircraft named in FAA DRS
Named aircraft: Viking Air DHC-6-100, Viking Air DHC-6-200, and Viking Air DHC-6-300. Confirm the approved model list, serial effectivity, configuration, and certificate revision.
Buyer checks
Confirm before sourcing
- Does the approval cover the required model, serial range, and configuration for Viking Air DHC-6-100 and Viking Air DHC-6-200, and 1 more aircraft configuration?
- Which configuration, loads, materials, inspections, and damage limits apply?
- Who can legally supply the design data, kit, instructions, and ICAs?
- What parts, labor, conformity, and return-to-service work are excluded?
Related aircraft structures STCs
Installation of wing leading edge cuffs and vertical stabilizer vortex generators.
FAA holder: Curry Aviation LLC
Installation of wing leading edge cuffs and drooped tips.
FAA holder: Curry Aviation LLC
Regulatory Intelligence
Research aviation evidence
Cited research and approval comparison. Professional adds monitoring and change review.
Keep browsing the free public research library