Skip to content
Avionics

STC SA00464SE

FAA DRS lists SA00464SE as Current · Reissued, held by Garmin AT Inc., for Partenavia Costruzioni Aeronauticas SpA P 68, Partenavia Costruzioni Aeronauticas SpA P 68 Observer, and Partenavia Costruzioni Aeronauticas SpA P 68B, and 4 more aircraft configurations. Recorded change: Installation of a II Morrow Apollo Model GX-55 TSO C129 Class A2 GPS for Supplemental IFR Enroute, Terminal, Remote/Oceanic or VFR navigation in accordance with the applicable data listed on the Master Drawing List, II Morrow P/N 560-1000-00, Revision -, and Airplane Flight Manual Supplement, P/N 560-1009-00, Revision -, or later FAA approved revisions. Snapshot dated June 30, 2026.

FAA-listed holder
Aircraft configurations
7
FAA revision date
FAA status
Current · Reissued

Recorded modification

What the FAA record covers

Installation of a II Morrow Apollo Model GX-55 TSO C129 Class A2 GPS for Supplemental IFR Enroute, Terminal, Remote/Oceanic or VFR navigation in accordance with the applicable data listed on the Master Drawing List, II Morrow P/N 560-1000-00, Revision -, and Airplane Flight Manual Supplement, P/N 560-1009-00, Revision -, or later FAA approved revisions.

SA00464SE identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.

Applicability

Aircraft named in FAA DRS

Named aircraft: Partenavia Costruzioni Aeronauticas SpA P 68, Partenavia Costruzioni Aeronauticas SpA P 68 Observer, and Partenavia Costruzioni Aeronauticas SpA P 68B, and 4 more aircraft configurations. Confirm the approved model list, serial effectivity, configuration, and certificate revision.

Buyer checks

Confirm before sourcing

  1. 01Does it cover the exact Partenavia Costruzioni Aeronauticas SpA P 68 and Partenavia Costruzioni Aeronauticas SpA P 68 Observer, and 5 more aircraft configurations model, serial range, and configuration?
  2. 02Which part numbers, software versions, interfaces, and manual changes apply?
  3. 03Who can legally supply the design data, kit, instructions, and ICAs?
  4. 04What parts, labor, conformity, and return-to-service work are excluded?