Skip to content
Engine and powerplant

STC SA01301WI

FAA DRS lists SA01301WI as Current · Issued, held by Radial Engines Ltd, for Waco Aircraft YMF. Recorded change: Installation of Jacobs R-755B2 or R-755B2M engine modified for fuel injection in accordance with STC SE01288WI, J.P. Instruments Fuel Flow meter in accordance with STC SA00432SE, and electric fuel boost pump. Data required: (1) Radial Engines Master Drawing List Report REL1003-13, Revision (IR), dated October 4, 2004, (2) Radial Engines Limited Instruction for Continued Airworthiness Report REL1003-12, Revision (IR), dated October 4, 2004, and (3) FAA Approved Airplane Flight Manual Supplement REL1003-5, Revision (IR), dated January 21, 2005 or later FAA Approved revisions to (1), (2), or (3). Snapshot dated June 30, 2026.

FAA-listed holder
Aircraft configurations
1
FAA revision date
FAA status
Current · Issued

Recorded modification

What the FAA record covers

Installation of Jacobs R-755B2 or R-755B2M engine modified for fuel injection in accordance with STC SE01288WI, J.P. Instruments Fuel Flow meter in accordance with STC SA00432SE, and electric fuel boost pump. Data required: (1) Radial Engines Master Drawing List Report REL1003-13, Revision (IR), dated October 4, 2004, (2) Radial Engines Limited Instruction for Continued Airworthiness Report REL1003-12, Revision (IR), dated October 4, 2004, and (3) FAA Approved Airplane Flight Manual Supplement REL1003-5, Revision (IR), dated January 21, 2005 or later FAA Approved revisions to (1), (2), or (3).

SA01301WI identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.

Applicability

Aircraft named in FAA DRS

Named aircraft: Waco Aircraft YMF. Confirm the approved model list, serial effectivity, configuration, and certificate revision.

Buyer checks

Confirm before sourcing

  1. 01Does it cover the exact Waco Aircraft YMF model, serial range, and configuration?
  2. 02Which powerplant configuration, limits, instruments, and maintenance data apply?
  3. 03Who can legally supply the design data, kit, instructions, and ICAs?
  4. 04What parts, labor, conformity, and return-to-service work are excluded?