Skip to content
Fuel systems

STC SB03358CH

FAA DRS lists SB03358CH as Current · Issued, held by Portland Rose Hot Air Balloon, for Balony Kubicek spol sro BB70Z. Recorded change: Replace the Balony Kubicek Basket/Burner system with the Lindstrand Balloons Basket, Part Number BA-032-A-001, S/N BA068; the Lindstrand Balloons Burner, Part Number BU-004-A-001, S/N BU071. Replace the Balony Kubicek fuel tanks with the Lindstrand Balloons V40 Fuel Tanks, S/Ns 346 and 345; Cameron Balloons CB599 Fuel Tanks, S/N 3066-1761, Worthington Fuel Tank, S/N 44937J. Extra Thunder & Colt V30 Fuel Tanks, S/Ns 100-2414, 100-2308, and 100-2311, may also be used. Snapshot dated June 30, 2026.

FAA-listed holder
Portland Rose Hot Air Balloon
Aircraft configurations
1
FAA revision date
FAA status
Current · Issued

Recorded modification

What the FAA record covers

Replace the Balony Kubicek Basket/Burner system with the Lindstrand Balloons Basket, Part Number BA-032-A-001, S/N BA068; the Lindstrand Balloons Burner, Part Number BU-004-A-001, S/N BU071. Replace the Balony Kubicek fuel tanks with the Lindstrand Balloons V40 Fuel Tanks, S/Ns 346 and 345; Cameron Balloons CB599 Fuel Tanks, S/N 3066-1761, Worthington Fuel Tank, S/N 44937J. Extra Thunder & Colt V30 Fuel Tanks, S/Ns 100-2414, 100-2308, and 100-2311, may also be used.

SB03358CH identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.

Applicability

Aircraft named in FAA DRS

Named aircraft: Balony Kubicek spol sro BB70Z. Confirm the approved model list, serial effectivity, configuration, and certificate revision.

Buyer checks

Confirm before sourcing

  1. 01Does it cover the exact Balony Kubicek spol sro BB70Z model, serial range, and configuration?
  2. 02Which tanks, plumbing, usable-fuel assumptions, and inspections apply?
  3. 03Who can legally supply the design data, kit, instructions, and ICAs?
  4. 04What parts, labor, conformity, and return-to-service work are excluded?