STC SB04018CH
FAA DRS lists SB04018CH as Current · Issued, held by Cameron Balloons US, for Cameron Balloons US Z-120. Recorded change: Replace Cameron Balloons US burner with Lindstrand burner. Snapshot dated June 30, 2026.
Recorded modification
What the FAA record covers
Replace Cameron Balloons US burner with Lindstrand burner.
SB04018CH identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.
Applicability
Aircraft named in FAA DRS
Named aircraft: Cameron Balloons US Z-120. Confirm the approved model list, serial effectivity, configuration, and certificate revision.
Buyer checks
Confirm before sourcing
- 01Does it cover the exact Cameron Balloons US Z-120 model, serial range, and configuration?
- 02Which configuration, parts, installation data, limitations, and ICAs apply?
- 03Who can legally supply the design data, kit, instructions, and ICAs?
- 04What parts, labor, conformity, and return-to-service work are excluded?
Related other aircraft modifications STCs
Installation of IRCM system, model ALQ-144A(V)7, in accordance with Pro Star Aviation Master Document List, Document Number 0403-MDL-01, dated November 19, 2003.
FAA holder: BAE SYSTEMS Information and Electronic Systems Integration Inc.
Installation of BAE Systems AN/ALQ-144B(V)2 IRCM System.
FAA holder: BAE SYSTEMS Information and Electronic Systems Integration Inc.
Install extended baggage compartment and baggage net in accordance with Cub Crafters, Inc., Master Drawing List, MDL105400, Revision D, dated November 2, 1999, or later Federal Aviation Administration (FAA) approved revision, and its listed data.
FAA holder: Cub Crafters Inc
Installation of an Executive Completion.
FAA holder: Gulfstream Aerospace Corporation