STC SE03232CH
FAA DRS lists SE03232CH as Current · Amended, held by Hartzell Propeller Inc., for Continental Motors C90-12F, Continental Motors C90-12FH, and Continental Motors C90-12FJ, and 37 more aircraft configurations. Recorded change: Installation of Engine Preheat Kit p/n TA2925-1 for 115 volt application. Snapshot dated June 30, 2026.
Recorded modification
What the FAA record covers
Installation of Engine Preheat Kit p/n TA2925-1 for 115 volt application.
SE03232CH identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.
Applicability
Aircraft named in FAA DRS
Named aircraft: Continental Motors C90-12F, Continental Motors C90-12FH, and Continental Motors C90-12FJ, and 37 more aircraft configurations. Confirm the approved model list, serial effectivity, configuration, and certificate revision.
Buyer checks
Confirm before sourcing
- 01Does it cover the exact Continental Motors C90-12F and Continental Motors C90-12FH, and 38 more aircraft configurations model, serial range, and configuration?
- 02Which powerplant configuration, limits, instruments, and maintenance data apply?
- 03Who can legally supply the design data, kit, instructions, and ICAs?
- 04What parts, labor, conformity, and return-to-service work are excluded?
Related engine and powerplant STCs
Installation of extended engine mount, revised cowling and induction system, Hamilton Standard 22D40 or 12D40 constant speed propeller, and modified elevator trim tab system in accordance with Serv-Aero Engineering, Inc. FAA sealed Master Drawing List MDL5379, dated May 3, 1979, or later FAA approved revision. Pratt and Whitney R1340-AN-1 engine previously installed per Type Certificate A4SW is required with this installation. (Restricted Category).
FAA holder: Thrush Aircraft Inc.
Installation of passenger/cargo compartment in accordance with Serv-Aero Engineering, Inc. FAA sealed Master Drawing List MDL 10379 "A", dated November 16, 1979, or later FAA approved revision. Pezetel PZL-3S engine is required with this installation. FAA Approved Serv-Aero Airplane Flight Manual No. 101079 dated November 26, 1979 is required with this installation. (S2R S/N 2526R and up modified by STC SA3897WE) (S2R-R3S S/N R3S-001 AND UP).
FAA holder: Thrush Aircraft Inc.
Installation of passenger/cargo compartment in accordance with Serv-Aero Engineering, Inc. FAA sealed Master Drawing List MDL 101179 "A", dated November 16, 1979, or later FAA approved revision. Pezetel PZL-3S engine is required with this installation. FAA Approved Serv-Aero Airplane Flight Manual No. 101079 dated November 26, 1979 is required with this installation. (S2R S/N 2526R AND UPmodified by STC SA3897WE) (S2R-R3S S/N R3S-001 AND UP, NORMAL CATEGORY).
FAA holder: Thrush Aircraft Inc.