STC SR01642SE
FAA DRS lists SR01642SE as Current · Amended, held by Columbia Helicopters Inc, for Boeing Defense & Space Group 107-II, Kawasaki Heavy Industries KV107-II, and Kawasaki Heavy Industries KV107-IIA. Recorded change: Installation of mounting provisions, utility equipment. Snapshot dated June 30, 2026.
Recorded modification
What the FAA record covers
Installation of mounting provisions, utility equipment.
SR01642SE identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.
Applicability
Aircraft named in FAA DRS
Named aircraft: Boeing Defense & Space Group 107-II, Kawasaki Heavy Industries KV107-II, and Kawasaki Heavy Industries KV107-IIA. Confirm the approved model list, serial effectivity, configuration, and certificate revision.
Buyer checks
Confirm before sourcing
- 01Does it cover the exact Boeing Defense & Space Group 107-II and Kawasaki Heavy Industries KV107-II, and 1 more aircraft configuration model, serial range, and configuration?
- 02Which configuration, parts, installation data, limitations, and ICAs apply?
- 03Who can legally supply the design data, kit, instructions, and ICAs?
- 04What parts, labor, conformity, and return-to-service work are excluded?
Related other aircraft modifications STCs
Install refueling steps in accordance with Cub Crafters, Inc. Master Drawing List, MDL103440, Revision -, dated November 30, 1999, or later Federal Aviation Administration (FAA) approved revision.
FAA holder: Cub Crafters Inc
Install headliner in accordance with Cub Crafters, Inc., Master Drawing List, MDL 105600, Rev. A, dated July 30, 2001, or later FAA approved revision.
FAA holder: Cub Crafters Inc
Install windows in accordance with Cub Crafters Master Drawing List CR102500-3, dated July 24, 2002, or later Federal Aviation Administration approved revisions. Since there are no special instructions for continued airworthiness required, Title 14 Code of Federal Regulation part 43 is considered adequate for the maintenance of the installation.
FAA holder: Cub Crafters Inc
Fabrication of PA-18 Inspection Covers in accordance with Cub Crafters, Inc. Master Drawing List Report CR124500-3, dated July 14, 2003, or later Federal Aviation Administration (FAA) approved revision. The inspection covers must be installed in accordance with Cub Crafters, Inc. Installation Instructions Report CR124500-2, dated June 23, 2003, or later FAA-approved revision.
FAA holder: Cub Crafters Inc