STC SR01845SE
FAA DRS lists SR01845SE as Current · Reissued, held by Cascade Flying Service LLC, for Scotts-Bell 47 47G-2A-1, Scotts-Bell 47 47G-2A, and Scotts-Bell 47 47G-3, and 10 more aircraft configurations. Recorded change: Installation of a barrier air filtration system. Snapshot dated June 30, 2026.
Recorded modification
What the FAA record covers
Installation of a barrier air filtration system.
SR01845SE identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.
Applicability
Aircraft named in FAA DRS
Named aircraft: Scotts-Bell 47 47G-2A-1, Scotts-Bell 47 47G-2A, and Scotts-Bell 47 47G-3, and 10 more aircraft configurations. Confirm the approved model list, serial effectivity, configuration, and certificate revision.
Buyer checks
Confirm before sourcing
- 01Does it cover the exact Scotts-Bell 47 47G-2A-1 and Scotts-Bell 47 47G-2A, and 11 more aircraft configurations model, serial range, and configuration?
- 02Which configuration, parts, installation data, limitations, and ICAs apply?
- 03Who can legally supply the design data, kit, instructions, and ICAs?
- 04What parts, labor, conformity, and return-to-service work are excluded?
Related other aircraft modifications STCs
Installation of LAI LH Heated Windshield.
FAA holder: Lee Aerospace Inc.
Installation of Single Garmin GTN 725(Xi)/GTN 750 (Xi) Unit and optional Garmin Flight Stream FS 510.
FAA holder: AVIONIK STRAUBING ENTWICKLUNGS GmbH
Installation of Heli-Preheat Kit, p/n TA3132-1 for 115 volt application in accordance with Heli-Preheat Kit drawing TA3132-1 Revision G, dated December 11, 2023 or later FAA approved revisions and Preheat Kit Installation Instruction TNH3132 Revision C, dated November 7, 2023 or later FAA approved revisions.
FAA holder: HARTZELL PROPELLER LLC
Installation of Heli-Preheat Kit, p/n TA3193-1 for 115 volt application in accordance with Heli-Preheat Kit drawing TA3193-1 Revision D, dated December 11, 2023 or later FAA approved revisions and Preheat Kit Installation Instruction TNH3193 Revision B, dated July 6, 2018 or later FAA approved revisions.
FAA holder: HARTZELL PROPELLER LLC