Skip to content
Cargo and special mission

STC SR03923AT

Recorded change: Installation of Aeronautical Accessories Lighting and Vision Accessories. This installation will be in accordance with DER Services Master Data List MDL-A2009-095-1, Rev-C, dated June 27, 2011, or later FAA approved revisions, and Aeronautical Accessories Drawing List AA-10080 Lighting/Vision Accessories Rev-H, dated June 21, 2011, or later FAA approved revisions. Any of the following kits can be installed individually or in any combination. Preflight Lighting Kit per Installation Instructions AA-10093, Rev-C, dated 6/17/11, or later FAA approved revisions. Courtesy Lighting Kit per Installation Instructions AA-10029, Rev-D, dated 6/21/11, or later FAA approved revisions. Baggage Compartment Light Kit per Installation Instructions AA-10032, Rev-C, dated 6/9/11, or later FAA approved revisions. Tail Rotor Camera Kit per Installation Instructions AA-10092, Rev-D, dated 6/13/11, or later FAA approved revisions. FAA DRS lists SR03923AT as Current · Reissued, held by Bell Helicopter Textron Inc., for Bell Helicopter Textron Canada 407. Snapshot dated June 30, 2026.

Open FAA record
Share
Aircraft configurations
1
FAA revision date
FAA status
Current · Reissued

Recorded modification

What the FAA record covers

SR03923AT identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.

Applicability

Aircraft named in FAA DRS

Named aircraft: Bell Helicopter Textron Canada 407. Confirm the approved model list, serial effectivity, configuration, and certificate revision.

Buyer checks

Confirm before sourcing

  1. Does the approval cover the required model, serial range, and configuration for Bell Helicopter Textron Canada 407?
  2. Which mission equipment, structural provisions, and limitations are approved?
  3. Who can legally supply the design data, kit, instructions, and ICAs?
  4. What parts, labor, conformity, and return-to-service work are excluded?