STC ST00736SE
FAA DRS lists ST00736SE as Current · Reissued, held by B/E Aerospace, Inc. - FSI, for Boeing 727-200 Series and Boeing 727-100 Series. Recorded change: Installation of new flight crew oxygen masks and holders. Snapshot dated June 30, 2026.
Recorded modification
What the FAA record covers
Installation of new flight crew oxygen masks and holders.
ST00736SE identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.
Applicability
Aircraft named in FAA DRS
Named aircraft: Boeing 727-200 Series and Boeing 727-100 Series. Confirm the approved model list, serial effectivity, configuration, and certificate revision.
Buyer checks
Confirm before sourcing
- 01Does it cover the exact Boeing 727-200 Series and Boeing 727-100 Series model, serial range, and configuration?
- 02Which equipment, inspection intervals, procedures, and limitations apply?
- 03Who can legally supply the design data, kit, instructions, and ICAs?
- 04What parts, labor, conformity, and return-to-service work are excluded?
Related safety and emergency equipment STCs
Installation of a baggage compartment smoke/fire detection and fire suppression system.
FAA holder: Gulfstream Aerospace Corporation
Installation of Artex Emergency Locator Transmitter (ELT) C406.
FAA holder: Avionics Design Services Ltd.
Honeywell Enhanced Ground Proximity Warning System (EGPWS) Runway Awareness and Advisory System (RAAS) Software Function Activation.
FAA holder: Empire Avionics
Install fuselage top emergency exit door.
FAA holder: Eaglejet Aviation Inc.