STC ST01025SE
FAA DRS lists ST01025SE as Current · Amended, held by Northwest Aerospace Technologies Inc, for Boeing 777-200 Series and Boeing 777-300 Series. Recorded change: Installation of General Dynamics EmPower and EmPower Systems. Snapshot dated June 30, 2026.
Recorded modification
What the FAA record covers
Installation of General Dynamics EmPower and EmPower Systems.
ST01025SE identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.
Applicability
Aircraft named in FAA DRS
Named aircraft: Boeing 777-200 Series and Boeing 777-300 Series. Confirm the approved model list, serial effectivity, configuration, and certificate revision.
Buyer checks
Confirm before sourcing
- 01Does it cover the exact Boeing 777-200 Series and Boeing 777-300 Series model, serial range, and configuration?
- 02Which configuration, parts, installation data, limitations, and ICAs apply?
- 03Who can legally supply the design data, kit, instructions, and ICAs?
- 04What parts, labor, conformity, and return-to-service work are excluded?
Related other aircraft modifications STCs
Installation of Inflight Services video projection system P/N 105-D-1065.
FAA holder: Burrana Inc.
Installation of an Inflight Services video projection system DC-10 Iberia, P/N 105-D-1094.
FAA holder: Burrana Inc.
Installation of Airborne video-cassette system.
FAA holder: Burrana Inc.
Installation of Airborne Video-cassette system.
FAA holder: Burrana Inc.