Skip to content
Cargo and special mission

STC ST01861LA

FAA DRS lists ST01861LA as Current · Issued, held by Structural Integrity Engineering, for McDonnell Douglas DC-8-63 and McDonnell Douglas DC-8-73. Recorded change: Modifications to the 9-G rigid barrier, cargo door surround structure and other attendant modifications. Snapshot dated June 30, 2026.

Aircraft configurations
2
FAA revision date
FAA status
Current · Issued

Recorded modification

What the FAA record covers

Modifications to the 9-G rigid barrier, cargo door surround structure and other attendant modifications.

ST01861LA identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.

Applicability

Aircraft named in FAA DRS

Named aircraft: McDonnell Douglas DC-8-63 and McDonnell Douglas DC-8-73. Confirm the approved model list, serial effectivity, configuration, and certificate revision.

Buyer checks

Confirm before sourcing

  1. 01Does it cover the exact McDonnell Douglas DC-8-63 and McDonnell Douglas DC-8-73 model, serial range, and configuration?
  2. 02Which mission equipment, structural provisions, and limitations are approved?
  3. 03Who can legally supply the design data, kit, instructions, and ICAs?
  4. 04What parts, labor, conformity, and return-to-service work are excluded?