STC ST02193SE
Recorded change: Installation of a new interim crew rest for Delta Air Lines A330-200 aircraft in accordance with Northwest Aerospace Technologies, Inc. (NAT) Master Drawing List N0382-D10, Revision B, dated September 8, 2011 or later Federal Aviation Administration (FAA) approved revisions. FAA DRS lists ST02193SE as Current · Issued, held by Northwest Aerospace Technologies Inc, for Airbus A330-201, Airbus A330-202, and Airbus A330-203, and 4 more aircraft configurations. Snapshot dated June 30, 2026.
Recorded modification
What the FAA record covers
ST02193SE identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.
Applicability
Aircraft named in FAA DRS
Named aircraft: Airbus A330-201, Airbus A330-202, and Airbus A330-203, and 4 more aircraft configurations. Confirm the approved model list, serial effectivity, configuration, and certificate revision.
Buyer checks
Confirm before sourcing
- Does the approval cover the required model, serial range, and configuration for Airbus A330-201 and Airbus A330-202, and 5 more aircraft configurations?
- Which configuration, parts, installation data, limitations, and ICAs apply?
- Who can legally supply the design data, kit, instructions, and ICAs?
- What parts, labor, conformity, and return-to-service work are excluded?
Related other aircraft modifications STCs
Installation of ram air cowling.
FAA holder: American Aviation Inc
Fabrication and Installation of Dahlia Doubler.
FAA holder: Fliegen Works Inc.
Fabrication and Installation of Panida Doubler.
FAA holder: Fliegen Works Inc.
Regulatory Intelligence
Research aviation evidence
Cited research and approval comparison. Professional adds monitoring and change review.
Keep browsing the free public research library