STC ST02415AT
Recorded change: Installation of floor panels. FAA DRS lists ST02415AT as Current 路 Issued, held by Associated Design, for Fokker Services F.27 Series. Snapshot dated June 30, 2026.
Recorded modification
What the FAA record covers
ST02415AT identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.
Applicability
Aircraft named in FAA DRS
Named aircraft: Fokker Services F.27 Series. Confirm the approved model list, serial effectivity, configuration, and certificate revision.
Buyer checks
Confirm before sourcing
- Does the approval cover the required model, serial range, and configuration for Fokker Services F.27 Series?
- Which configuration, loads, materials, inspections, and damage limits apply?
- Who can legally supply the design data, kit, instructions, and ICAs?
- What parts, labor, conformity, and return-to-service work are excluded?
Related aircraft structures STCs
Installation of wing leading edge landing lights.
FAA holder: Atlantic Coast Sea Planes LLC
Install wing front spar reinforcement kit.
FAA holder: Dynamic Aviation Group Inc.
Install wing front spar reinforcement kit.
FAA holder: Dynamic Aviation Group Inc.
Regulatory Intelligence
Research aviation evidence
Cited research and approval comparison. Professional adds monitoring and change review.
Keep browsing the free public research library