STC ST02707SE
Recorded change: Cargo Loading System Installation. FAA DRS lists ST02707SE as Current 路 Issued, held by B/E Aerospace Inc.-FSI, for Boeing 777-300ER Series. Snapshot dated June 30, 2026.
Recorded modification
What the FAA record covers
ST02707SE identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.
Applicability
Aircraft named in FAA DRS
Named aircraft: Boeing 777-300ER Series. Confirm the approved model list, serial effectivity, configuration, and certificate revision.
Buyer checks
Confirm before sourcing
- Does the approval cover the required model, serial range, and configuration for Boeing 777-300ER Series?
- Which mission equipment, structural provisions, and limitations are approved?
- Who can legally supply the design data, kit, instructions, and ICAs?
- What parts, labor, conformity, and return-to-service work are excluded?
Related cargo and special mission STCs
Installation of the Split Forward Cargo Door Window.
FAA holder: Airworthiness Resources Corporation
Installation of Precision Support Services' Dual Mission System (DMS).
FAA holder: Precision Support Services LLC
Installation of Fibrotek survey stinger.
FAA holder: Upper Limit Aviation
Conversion of an Airbus A321-200 passenger configuration airplane to a freighter configuration.
FAA holder: 321 Precision Conversions LLC
Regulatory Intelligence
Research aviation evidence
Cited research and approval comparison. Professional adds monitoring and change review.
Keep browsing the free public research library