STC ST02707SE
FAA DRS lists ST02707SE as Current · Issued, held by B/E Aerospace Inc.-FSI, for Boeing 777-300ER Series. Recorded change: Cargo Loading System Installation. Snapshot dated June 30, 2026.
Recorded modification
What the FAA record covers
Cargo Loading System Installation.
ST02707SE identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.
Applicability
Aircraft named in FAA DRS
Named aircraft: Boeing 777-300ER Series. Confirm the approved model list, serial effectivity, configuration, and certificate revision.
Buyer checks
Confirm before sourcing
- 01Does it cover the exact Boeing 777-300ER Series model, serial range, and configuration?
- 02Which mission equipment, structural provisions, and limitations are approved?
- 03Who can legally supply the design data, kit, instructions, and ICAs?
- 04What parts, labor, conformity, and return-to-service work are excluded?
Related cargo and special mission STCs
Installation of the Split Forward Cargo Door Window.
FAA holder: Airworthiness Resources Corporation
Installation of Precision Support Services' Dual Mission System (DMS).
FAA holder: Precision Support Services LLC
Installation of Fibrotek survey stinger.
FAA holder: Upper Limit Aviation
Conversion of an Airbus A321-200 passenger configuration airplane to a freighter configuration.
FAA holder: 321 Precision Conversions LLC