Skip to content
Electrical systems

STC ST03399AT

FAA DRS lists ST03399AT as Current · Amended, held by Gulfstream Aerospace Corporation, for Gulfstream Aerospace GV-SP. Recorded change: Installation of internal and external mounting provisions for mission system equipment (MSE) that include internal and external structural mounts and racks, external fairings and mission wiring provisions. Snapshot dated June 30, 2026.

Aircraft configurations
1
FAA revision date
FAA status
Current · Amended

Recorded modification

What the FAA record covers

Installation of internal and external mounting provisions for mission system equipment (MSE) that include internal and external structural mounts and racks, external fairings and mission wiring provisions.

ST03399AT identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.

Applicability

Aircraft named in FAA DRS

Named aircraft: Gulfstream Aerospace GV-SP. Confirm the approved model list, serial effectivity, configuration, and certificate revision.

Buyer checks

Confirm before sourcing

  1. 01Does it cover the exact Gulfstream Aerospace GV-SP model, serial range, and configuration?
  2. 02Which load analysis, wiring changes, protection, and limitations apply?
  3. 03Who can legally supply the design data, kit, instructions, and ICAs?
  4. 04What parts, labor, conformity, and return-to-service work are excluded?