STC ST11111SC
FAA DRS lists ST11111SC as Current · Reissued, held by StandardAero Business Aviation Services, LLC, for Boeing 747-8 Series. Recorded change: Installation of Civil Aircraft Missile Protection System (CAMPS) provisions. Snapshot dated June 30, 2026.
Recorded modification
What the FAA record covers
Installation of Civil Aircraft Missile Protection System (CAMPS) provisions.
ST11111SC identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.
Applicability
Aircraft named in FAA DRS
Named aircraft: Boeing 747-8 Series. Confirm the approved model list, serial effectivity, configuration, and certificate revision.
Buyer checks
Confirm before sourcing
- 01Does it cover the exact Boeing 747-8 Series model, serial range, and configuration?
- 02Which configuration, parts, installation data, limitations, and ICAs apply?
- 03Who can legally supply the design data, kit, instructions, and ICAs?
- 04What parts, labor, conformity, and return-to-service work are excluded?
Related other aircraft modifications STCs
Installation of Honeywell MK VIII EGPWS.
FAA holder: Western Avionics
Installation of Environmental Control System Ice Pellet Filter.
FAA holder: Learjet Inc.
Descriptive data pertaining to this design change are considered inadequate for duplication on other products. This approval is limited to Dassault Mystere Falcon 20-F5, Serial Number 430 only. Non-Group (Individual) aircraft approval for Reduced Vertical Separation Minimum (RVSM).
FAA holder: AeroMech Incorporated
Installation of AM-Safe, Inc. Child Safety System (CSS) in accordance with FAA Approved Master Drawing List No. MDL 505196, Revision C, dated January 24, 2005, or later FAA Approved revision, FAA Approved Model List (AML) Number ST01781LA, dated April 15, 2005, or later FAA Approved revision.
FAA holder: AMSAFE Inc.