STC ST12238IB
FAA DRS lists ST12238IB as Current · Issued, held by Cobalt Aerospace Limited, for Embraer SA ERJ 190-100 IGW, Embraer SA ERJ 190-100 LR, and Embraer SA ERJ 190-100 STD, and 5 more aircraft configurations. Recorded change: Installation of cabin system upgrades, comprising Photoluminescent Floor Path Marking (PLFPM). Snapshot dated June 30, 2026.
Recorded modification
What the FAA record covers
Installation of cabin system upgrades, comprising Photoluminescent Floor Path Marking (PLFPM).
ST12238IB identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.
Applicability
Aircraft named in FAA DRS
Named aircraft: Embraer SA ERJ 190-100 IGW, Embraer SA ERJ 190-100 LR, and Embraer SA ERJ 190-100 STD, and 5 more aircraft configurations. Confirm the approved model list, serial effectivity, configuration, and certificate revision.
Buyer checks
Confirm before sourcing
- 01Does it cover the exact Embraer SA ERJ 190-100 IGW and Embraer SA ERJ 190-100 LR, and 6 more aircraft configurations model, serial range, and configuration?
- 02Which layout, materials, flammability evidence, and weight changes apply?
- 03Who can legally supply the design data, kit, instructions, and ICAs?
- 04What parts, labor, conformity, and return-to-service work are excluded?
Related cabin and interiors STCs
Installation of a 14-passenger cabin interior and one additional crew seat.
FAA holder: Gulfstream Aerospace Corporation
Installation of an 18-passenger cabin interior and associated aircraft completion alterations.
FAA holder: Gulfstream Aerospace Corporation
Installation of an 18-passenger cabin interior.
FAA holder: Gulfstream Aerospace Corporation
Installation of a 14-passenger cabin interior and one additional crew seat.
FAA holder: Gulfstream Aerospace Corporation