Skip to content

Your next modification.
From idea to installed.

CONCEPT → CERTIFICATION PLANILLUSTRATIVE
Need & fleet demand
Aircraft configuration and an early certification plan define the work ahead.
01Define and plan

Start with the aircraft.
Plan the approval.

  • Turn an idea and fleet demand into a defined modification. Survey the target aircraft, its configuration and existing changes.
  • Set the certification basis, means of compliance and authority involvement early, with a certification plan or PSCP where applicable.
  • Connect scope, evidence gaps, suppliers and aircraft downtime in one delivery plan, so your team can make an informed go/no-go decision.
Book a discovery call
REQUIREMENTS → CONTROLLED DESIGNILLUSTRATIVE
Requirements & reuse
A controlled design baseline ties drawings and parts to the evidence still needed.
02Engineer and control

From requirements
to an installable design.

  • Develop the installation drawings, interfaces and bill of materials from agreed requirements and the aircraft survey.
  • Link each requirement to its design and planned compliance evidence. Reuse qualified equipment and prior data only within their applicable scope.
  • Carry design reviews, safety and integration analyses, and controlled revisions into the baseline for conformity and testing. EE coordinates the work and decisions.
Book a discovery call
FIRST AIRCRAFT → SCOPED STCILLUSTRATIVE
Prototype & conformity
The first aircraft generates evidence; approval covers the documented aircraft scope.
03Demonstrate and approve

Prove the modification.
Secure the approval.

  • Coordinate the first aircraft installation, conformity inspections and the ground or flight tests required by the agreed certification programme.
  • Close compliance findings with the applicant and authorized reviewers. Carry TSO article evidence, where applicable, into each aircraft-specific STC programme.
  • Record the issued STC, aircraft effectivity and limitations alongside the controlled installation data, continued-airworthiness instructions and flight-manual supplements as required.
Book a discovery call
APPROVED DESIGN → FLEET EMBODIMENTILLUSTRATIVE
Eligibility & rights
Fleet rollout preserves each aircraft’s installation, release and support history.
04Embody and sustain

Install aircraft by aircraft.
Support the fleet in service.

  • Match Marketplace demand to the approved aircraft scope. Confirm configuration, STC-use rights and compatible prior modifications before committing an installation.
  • EE coordinates suppliers, released kits and maintenance slots as prime. Track embodiment, required checks and the authorized return-to-service record for each aircraft.
  • Keep installed configuration and maintenance instructions in the same digital twin. Feed in-service findings and regulatory changes into controlled design revisions or STC extensions.
Book a discovery call
The engagement

How we work.

FDE-Managed Service

Forward Deployed Engineers coordinate delivery, review the evidence and keep your programme moving. Your team directs and reviews.

Enterprise MSA

Agree the scope, responsibilities and deliverables under an enterprise Master Services Agreement.

Base Subscription
+ outcome based pricing

A base subscription for the ongoing service, with outcome based pricing tied to agreed deliverables.

Let’s get your idea
into the fleet.

Book a discovery call