Non-routine findings
Gulfstream G650 non-routine closure records review
This review confirms that the non-routine cards raised during a Gulfstream G650 check each close with a proper disposition, a completed corrective action, and a final sign-off. It is run by or for the party evaluating or transferring a specific G650, usually right after a heavy check or during diligence, when the non-routine register has to be shown fully worked off. A records specialist reconciles the register against the closed cards, checks that each defect carries an engineering disposition where one is needed, and confirms the corrective action ties back to the finding. You receive an exception list of non-routines that do not close, a source map to the dispositions and corrective work, and a closure plan for the open items.
When this review is needed
- A heavy check has closed and the non-routine register has to be shown worked off before status credit is taken.
- A G650 is in diligence and the buyer wants every finding from the last check closed with evidence.
- A defect was dispositioned by engineering and the corrective action has to tie back to that disposition.
- Non-routines were deferred against the MEL or an engineering deferral and the deferral basis needs checking.
The problem
Non-routine findings are where a check's real story lives: the routine cards are predictable, but the defects discovered on opening the aircraft drive the disposition, the parts, and the corrective work. On a G650 check, a non-routine that is raised but whose disposition or corrective action never makes it back into the register leaves an open loop that the status does not show, and that loop surfaces when a buyer reconciles the register against the closed cards.
What gets reviewed
- The non-routine register reconciled against the closed non-routine cards from the event
- Each defect finding traced to an engineering disposition where the finding requires one
- Corrective actions confirmed to tie back to the finding and disposition they resolve
- Deferred non-routines checked against the MEL or engineering deferral that authorized them
- Final sign-offs confirmed on each closed non-routine card
- Non-routines that do not close logged with the disposition or evidence still missing
Scope this review
Tell us the asset, the event, and the evidence in scope, and we will outline a focused first engagement.
Send a representative, redacted record set and we will scope the review.
What gets validated
- Every non-routine on the register has a matching closed card or a documented deferral
- Each defect requiring engineering disposition carries one before its corrective action
- Corrective actions reference the finding and disposition they resolve
- Deferred items cite a valid MEL or engineering deferral basis
- Closed non-routine cards carry the final sign-off the task requires
Evidence normally required
- The non-routine register for the check or work event
- The closed non-routine cards and their corrective-action entries
- Engineering dispositions raised against the findings
- Any MEL or engineering deferrals applied to open items
- The return-to-service documentation for the event
Common discrepancies
- A non-routine on the register with no matching closed card in the package
- A defect corrected without the engineering disposition its finding required
- A corrective action that does not reference the finding it was meant to resolve
- A deferred item whose MEL or engineering deferral basis is unclear or expired
What is at stake
An unclosed non-routine means a defect the records cannot prove was corrected, which forces re-inspection or re-work before the status is relied on. A disposition that does not tie to its corrective action, or a deferral whose basis is unclear, undermines the return-to-service the check produced, and a pattern of loose closure lowers the confidence a buyer places in the whole event.
Move from findings to resolution
Move from findings to a documented resolution path.
How the work runs
Reconcile the register
Match every non-routine on the register to a closed card or a documented deferral.
Trace disposition to action
Confirm each defect requiring engineering disposition carries one before its corrective action.
Check the deferrals
Verify open items rest on a valid MEL or engineering deferral basis.
List the open loops
Log each non-routine that does not close and the evidence still needed.
What the buyer receives
- An exception list of non-routines that do not close against the register
- A source map tying each finding to its disposition and corrective action
- A closure plan for the open dispositions, corrective actions, and deferrals
Who uses the output
- Records teams confirming the non-routine register is fully worked off after a check
- Continuing-airworthiness teams checking that deferrals rest on a valid basis
- Asset and buyer teams reading how cleanly the last check's findings were closed
How the work fits into the transaction or program
The non-routine review runs at the exit of a check alongside the task-card review, together showing that both the planned and the discovered work closed with evidence. Its exception list drives the closure of open loops before the status is relied on, and the worked-off register supports the return-to-service the check event produced.
Aircraft-specific considerations
On a G650, non-routine findings often cluster around the cabin, the pressurized structure, and the systems that support long-range operation, and dispositions for owner-configured interiors can require engineering that a routine check package does not anticipate. Because these aircraft change hands as managed assets, a non-routine deferred under one operator can carry into a new manager's oversight, so the review checks that deferrals crossing a handover still rest on a valid basis.
Jurisdiction-specific considerations
A G650 whose check evidence must satisfy an EASA CAMO as well as an FAA operator needs non-routine closures whose dispositions and deferrals meet the receiving system, and a deferral acceptable under one may not carry to the other. The review flags non-routine closures whose basis will not satisfy the destination oversight.
Regulatory limits
The review confirms the non-routine findings closed with evidence or rest on a documented deferral. It does not disposition a defect, perform corrective work, or make an airworthiness determination on any finding.
What this review does not cover
- Dispositioning a defect or performing corrective work
- Granting or extending an MEL or engineering deferral
- Any airworthiness determination on a non-routine finding
Specific to this review
- Non-routines carry a check's real risk, because the discovered defects drive the parts and work the routine cards never anticipated.
- A disposition that does not tie to its corrective action leaves a defect the records cannot prove was fixed.
- A deferral that crosses an owner handover can lose its basis, so the review checks deferrals against the handover boundary.
Sources
U.S. Government (eCFR). Maintenance recordkeeping content and approval-for-return-to-service requirements, including 43.9, 43.11, and Appendix B.
Federal Aviation Administration. FAA guidance on making and keeping maintenance records and acceptable recordkeeping practices.
European Union / EASA. Continuing airworthiness, maintenance records, CAMO responsibilities, and the airworthiness review process in the EASA system.
U.S. Government (eCFR). Records an owner or operator must keep, including total time in service, current status of life-limited parts, and AD compliance.
Frequently asked questions
What is the risk in a non-routine that is raised but never closed on the register?
It represents a defect the records cannot prove was corrected. Until the disposition and corrective action are tied back to the finding, the status overstates the aircraft's condition, and a buyer or a new operator has to treat the item as open.
Relevant glossary terms
Related pages
Where this fits
Talk to an engineer who has done this work
We will walk through your current state, the records or evidence involved, and a scoped first engagement.
Talk through the aircraft, records, evidence, deadline, and next useful step.