Aircraft STC directory
Thrush Aircraft S2R-R1820 STCs
The Jun 30, 2026 FAA DRS snapshot contains 20 selected supplemental type certificates with status Current whose public applicability data names the Thrush Aircraft S2R-R1820. Use it to identify modification scope and recorded holders—not to determine serial-number effectivity, compatibility, installation approval, or commercial availability.
Modification demand surface
Recently revised S2R-R1820 STCs
Showing the 20 most recently revised records. Each entry links to the FAA source and separates public approval data from private commercial claims.
Installation of L-3 Communications Avionics Systems.
FAA holder: Acron Aviation Inc.
Installation of a Lever Throttle Quadrant.
FAA holder: Kawak Aviation Technologies Inc
Installation of a Pratt & Whitney PT6A-41, PT6A-42, or PT6A-42A engine and a Avia V508H/106B/A propeller.
FAA holder: Cascade Aircraft conversions LLC
Replace existing Engine Mount with Aero Innovations, LLC., Extended Engine Mount on certain Thrush S2R series aircraft fitted with PWC turboprop engine.
FAA holder: Aero Innovations LLC
To install full swiveling locking tail wheel assembly onto the existing spring steel tail gear.
FAA holder: Turbine Conversions Ltd
Installation of a ground single point fueling system.
FAA holder: Turbine Conversions Ltd
Install a Walter M601-E11 or M601-D11 engine and Avia V508-E-AG 106/A propeller per Cascade Aircraft Conversions Master Drawing List FW-CAC090-90 Revision B, dated August 10, 2004, and Cascade Aircraft Conversions Document FW-CAC090-12, Revision IR, dated June 2, 2004, Installation Manual for Thrush Aircraft S2R Series, Walter Turbine Installation or later FAA approved revisions to either of these documents.
FAA holder: Cascade Flying Service LLC
Installation of a replacement airframe fuel pump in accordance with Cascade Flying Service Master Drawing List FW-CFS545-90, Rev. B, dated October 19, 2011, or later FAA approved revision.
FAA holder: Cascade Aircraft conversions LLC
Installation of a Center Windshield.
FAA holder: Hershey Flying Services
Installation of a bonded doubler inside the wing leading edge.
FAA holder: Turbine Conversions Ltd
Installation of aluminum skins on the horizontal tail.
FAA holder: Aero Innovations LLC
Installation of aluminum skins on the horizontal tail.
FAA holder: Aero Innovations LLC
Installation of winglets.
FAA holder: Aero Spraying Service Inc.
Installation of under wing strap enhancer.
FAA holder: AG Aviation Innovations
Installation of vortex generators on the wing and tail surfaces of the above model aircraft.
FAA holder: Micro AeroDynamics Inc
Installation of modified Wing Spar Splice and Cap per Aeronautix Modification Kit.
FAA holder: Gulf Coast Ag Aircraft Sales and Maintenance
Installation of a Cool Start System in accordance with Installation Instructions , Revision A, dated April 14, 2011, or later FAA Approved revision.
FAA holder: Turbine Conversions Ltd
Installation of Avenger Extended Performance Front Spar Enhancement Kit (new wing front spar lower capts, center splice and doublers).
FAA holder: Avenger Aircraft and Services
Installation of Pheromone Distribution Pod System.
FAA holder: Turbine Conversions Ltd