Skip to content
Flight controls

STC ST02605AT

FAA DRS lists ST02605AT as Current · Issued, held by Chippewa Aerospace, Inc., for Embraer - Empresa Brasileira de Aeronautica SA EMB-120, Embraer - Empresa Brasileira de Aeronautica SA EMB-120ER, and Embraer - Empresa Brasileira de Aeronautica SA EMB-120FC, and 1 more aircraft configuration. Recorded change: Installation of MPC Products Corp. Rotary Variable Transformer (RVT) P/N GA2200A (3-position sensors right side; Rudder pedal-yaw, and control column-pitch and roll,) and p/n GA2202A (2-position sensors left side, column-itch and roll) to replace existing Flight Data Recorder System (FDRS) Potentiometers position sensors. Snapshot dated June 30, 2026.

FAA-listed holder
Aircraft configurations
4
FAA revision date
FAA status
Current · Issued

Recorded modification

What the FAA record covers

Installation of MPC Products Corp. Rotary Variable Transformer (RVT) P/N GA2200A (3-position sensors right side; Rudder pedal-yaw, and control column-pitch and roll,) and p/n GA2202A (2-position sensors left side, column-itch and roll) to replace existing Flight Data Recorder System (FDRS) Potentiometers position sensors.

ST02605AT identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.

Applicability

Aircraft named in FAA DRS

Named aircraft: Embraer - Empresa Brasileira de Aeronautica SA EMB-120, Embraer - Empresa Brasileira de Aeronautica SA EMB-120ER, and Embraer - Empresa Brasileira de Aeronautica SA EMB-120FC, and 1 more aircraft configuration. Confirm the approved model list, serial effectivity, configuration, and certificate revision.

Buyer checks

Confirm before sourcing

  1. 01Does it cover the exact Embraer - Empresa Brasileira de Aeronautica SA EMB-120 and Embraer - Empresa Brasileira de Aeronautica SA EMB-120ER, and 2 more aircraft configurations model, serial range, and configuration?
  2. 02Which control configuration, rigging, limitations, and inspections apply?
  3. 03Who can legally supply the design data, kit, instructions, and ICAs?
  4. 04What parts, labor, conformity, and return-to-service work are excluded?