STC ST11366DS
FAA DRS lists ST11366DS as Current · Reissued, held by Mammoth Freighters LLC, for Boeing 777-200 Series, Boeing 777-300 Series, and Boeing 777-300ER Series. Recorded change: Installation of Landing Gear Strut Data Collection System. Snapshot dated June 30, 2026.
Recorded modification
What the FAA record covers
Installation of Landing Gear Strut Data Collection System.
ST11366DS identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.
Applicability
Aircraft named in FAA DRS
Named aircraft: Boeing 777-200 Series, Boeing 777-300 Series, and Boeing 777-300ER Series. Confirm the approved model list, serial effectivity, configuration, and certificate revision.
Buyer checks
Confirm before sourcing
- 01Does it cover the exact Boeing 777-200 Series and Boeing 777-300 Series, and 1 more aircraft configuration model, serial range, and configuration?
- 02Which gear, wheel, brake, tire, and hydraulic configurations apply?
- 03Who can legally supply the design data, kit, instructions, and ICAs?
- 04What parts, labor, conformity, and return-to-service work are excluded?
Related landing gear and brakes STCs
Installation of landing gear position mirror on left wing tip tank.
FAA holder: TALCO Aviation
Installation of the nose tire scraper P/N TSL-100.
FAA holder: Aero Twin Inc.
Installation of Cleveland and ABI, LLC Wheel and Brake Kits.
FAA holder: ABI LLC
Incorporation of improved takeoff and landing performance data due to installation of the Advent Aircraft Systems anti-skid braking system.
FAA holder: Textron Aviation Inc.