Category guide · Aircraft maintenance programme teams
Compare aircraft maintenance programme bridging support
Decide whether you need preparation of a new bridging analysis, oversight of the work it creates, or review of documentation supporting an existing bridge. Use the receiving programme and effective revisions to set the basis. A completed status import is useful only after each affected task has a documented history, result or unresolved disposition.
Sources reviewed
Decision criteria
| Decision | Approach | Acceptance evidence |
|---|---|---|
| Prepare and manage the bridge | Vector lists bridging management, programme preparation and records review in aircraft acquisitions. Avtrac cites bridging-check projects. | Require a task mapping and gap list against the programme versions, the proposed basis for each next due and handover of assumptions. |
| Manage resulting work | Shannon Technical Services describes transition monitoring, maintenance event oversight, configuration control and programme updates. | Ask which work resulting from the bridge enters the maintenance input, and what source evidence will be available for later validation. |
| Verify the evidence for an existing bridge | Endeavor Elements publishes a bridging documentation review and describes checking programme revisions and authorisations in diligence. | Return references for the bridge analysis and associated work package, missing substantiation and independently reviewable handover exceptions. |
Use a changed interval as a sample
Select a task whose interval differs between the old and receiving programmes. Have the bidder identify the last accomplishment, programme revisions, and supporting evidence for the next due under the receiving programme. If a necessary approval has not been located, keep it visible with an owner.
A programme engineer can prepare the bridge while a records reviewer tests the evidence of work actually accomplished. The party with programme authority decides which assumptions and intervals can be adopted.