Provider comparison · STC applicants and aircraft modification teams
AeroTEC or Endeavor Elements for an aircraft STC program
Consider AeroTEC when the project needs an integrated engineering, modification and flight-test organization to produce the certification evidence. Consider Endeavor Elements when you need a delivery lead to connect the aircraft survey, requirements, substantiation, conformity and supplier work to the agreed certification and embodiment plan. Where the scope uses both an execution partner and a program lead, decide who accepts the test input baseline before anyone books an aircraft.
Sources reviewed
Decision criteria
| Decision | AeroTEC | Endeavor Elements |
|---|---|---|
| Where will the physical work happen? | AeroTEC documents design, manufacturing, modification and flight testing. It gives civil examples including the Split Scimitar Winglet and weather radar changes. | EE’s modification service scopes target aircraft, supplier work and first-article installation, then coordinates the applicable conformity and tests. |
| What does the evidence package contain? | Ask for the approved test plan inputs, conformity assumptions, data reduction and the report or manual deliverables actually included in the proposal. | Agree the compliance matrix, referrable design revisions and an evidence register with owners for open findings. |
| Who owns approval and fleet handoff? | AeroTEC describes preparing reports and manual updates for submission to the FAA or other authority. Define the applicant, reviewer roles and approval path. | EE’s published process carries issued scope, effectivity and installation data into embodiment. Confirm the agreed source pack and which party is authorized for each decision. |
Protect the test configuration
Before ordering flight-test work for a cabin or avionics modification, agree which aircraft configuration and installation drawing govern the test, who supplies the test article, and who records changes. If the result supports an amendment rather than the original scope, update the evidence register and installation assumptions before scheduling the first fleet aircraft.