Skip to content

Buyer-specific guide · FAA Part 145 repair stations

Adding capability at an FAA Part 145 repair station

Pick the exact article and proposed maintenance. Establish the authority path with the quality manager and verify the relevant self-evaluation where a limited-rating capability list applies. Keep the first customer work separate from the readiness exercise until the station has established authority and confirmed resources.

Sources reviewed

Decision criteria

DecisionApproachAcceptance evidence
ScopeCompare the component family, intended repair and work location to current ratings and limitations.The quality manager identifies the required actions under the current authority and procedures.
First-job readinessShow where a technician gets current model-specific data and verified test equipment.The dry run identifies any resource with unresolved access, calibration or qualification.
Dispatch controlDecide how intake and production records reflect the work that can be accepted.The station can demonstrate a hold for excluded work and recover the supporting change records.

Combine targeted expertise with station ownership

JDA documents FAA repair station certification and continued support. Oliver Wyman Vector describes Part 145 consulting. Shannon Technical Services lists engineering, CAMO and technical representation, which may be relevant to a separately scoped technical workstream. Ask for the proposed specialist’s exact FAA rating or capability-change experience. The repair station retains responsibility for its capability and for authorized release.

Review one limited-rating example

Send Endeavor Elements current authorization records, the capability list, the article and work description, facility and tooling details, and personnel and data records. Part 145 Management can coordinate a readiness register and work-evidence baseline. The station owns its self-evaluation and applicable FAA communication. A requested addition outside current authorized scope follows the appropriate FAA path.

Discuss the work

Part 145 Management

Sources