Skip to content

Buyer-specific guide · FAA Part 145 repair stations

FAA Part 145 QCM changes for active repair stations

Take an affected article through a normal route and an exception path with the inspectors who work those jobs. A useful QCM revision shows which checks happen at each stage and which authorized person can clear a hold or approve return to service.

Sources reviewed

Decision criteria

DecisionApproachAcceptance evidence
Affected workSample an article that crosses receiving, preliminary inspection and final release under the changed procedure.Each inspection links the applicable data, inspector and record.
Exception pathRehearse a gauge found out of calibration after an earlier inspection.Staff can identify affected work, who controls the hold and where a follow-up decision is kept.
Release and ownershipUpdate the manual, referenced forms and training together.The quality team can recover both the effective QCM revision and the evidence that supports a sampled release.

Buy the missing capability

Select a Part 145 manual specialist such as JDA when the station needs authoring and assessment support. Use an independent audit specialist such as Baines Simmons for observed practice and control testing, subject to FAA experience for the work. Sofema publishes separate EASA exposition guidance. Confirm the jurisdiction and output of any multiauthority assignment.

Keep inspection decisions with the station

Share a QCM extract, recent inspection records, current references and the details of the changed tool or data workflow. Endeavor Elements can prepare a revision and link quality records through Part 145 Management. Preserve authorized station review for inspection, manual change notification and return-to-service decisions.

Discuss the work

Part 145 Management

Sources