Skip to content

Three-way comparison · FAA repair station applicants

Vector, JDA and EE for initial FAA Part 145 certification support

Ask Vector and JDA to identify their U.S. repair station scope for the particular ratings, locations and milestones. JDA describes new-applicant support and documentation directly. Scope Endeavor Elements around the procedures and operating proof the station needs to prepare and maintain. The applicant remains responsible for the submission and the FAA makes certification decisions.

Sources reviewed

Decision criteria

Selection testOliver Wyman VectorJDAEndeavor Elements
Match the applicantObtain the relevant U.S. repair station example and the consultant’s role.Check which new-applicant phases, documents and corrections are included.Define specific manuals, training, capability or evidence deliverables with the owner.
Demonstrate readinessAsk how it exercises the proposed process and materials at the planned location.Request a work-through from the application evidence to an actual station workflow.Run a representative job to show data, tooling, staff eligibility and inspection steps.
Retain the resultAgree the handoff from advisory support to operating owners.Agree version-controlled materials and remaining actions at close.Put the approved or accepted documents, as applicable, into the station’s maintained evidence workflow.

Ask all bidders about one narrow rating

Specify one proposed limited-rating capability with its data, tooling and people. Ask each bidder which pieces it will author or review, who is expected to demonstrate them, and how the station would retain the evidence if the scope changes.

Discuss the work

Explore Part 145 management

Sources