Category guide · Chief inspectors and quality managers
Repair station audit preparation providers compared
Use internal preparation to retrieve and organize evidence and assign known gaps. Use a qualified independent auditor for a credible test of how the station works against a defined standard. A useful engagement shows how a sampled conclusion can be repeated.
Sources reviewed
Decision criteria
| Decision | Approach | Acceptance evidence |
|---|---|---|
| Basis | Identify the authority, customer standard or internal procedure driving the audit. | The audit plan names the baseline and specific locations, capabilities and procedures included. |
| Sampling | Select work records across dates and functions and trace the evidence in both directions. | Each result ties the work sample to the applicable procedure and underlying record. |
| Preparation | Determine who owns findings, immediate follow-up and evidence retrieval on the audit date. | The station can retrieve the pack independently and show current status for each finding. |
Compare external assignments
JDA documents Part 145 performance assessment preparation. Baines Simmons offers independent aviation audit and compliance monitoring. ACS describes operational and maintenance safety auditing for air operators. For a repair station, verify the proposed auditor’s experience with the applicable FAA or other approved maintenance organization scope.
Build repeatable station evidence
For Part 145 Management, supply the current certificate and operations specifications, manuals, selected work records and prior findings. Endeavor Elements can assemble linked personnel, tooling, work and quality evidence for station review. The FAA describes the internal evaluation program in AC 145-5 as voluntary. An operator’s auditing or corrective action obligations may arise from its rules, procedures or contracts.