Assign technical remediation after aviation acquisition diligence
Hand over the investment thesis and the individual findings together. Assign findings from the deal report to a station or asset owner, agree what evidence or action closes each one, and retain the condition, budget or milestone it influenced. Allocate authority and reporting so completed actions can be confirmed in normal operations.
Sources reviewed
Decision criteria
| At diligence close | Post-close owner | Proof to the investment team |
|---|---|---|
| Change to operating plan | Give the relevant operations lead a dated work package and a baseline. | Demonstrate effect on the measure that supported the plan, with source dates and assumptions. |
| Uncertain authority or scope | Route the issue to the accountable role and appropriate specialist. | Retain current authority documentation and conditions for exercising the capability. |
| Residual maintenance or records exposure | Assign a technical lead and a commercial owner for resulting cost changes. | Show the relevant source evidence and the signed disposition or remaining open condition. |
Reopen one finding that changes the investment case
Choose an issue tied to the ability to add a planned repair capability. Ask the operating team to show the controlled evidence for the capability and the steps still owned by the station. Give the investment committee the consequence of a delay while the station works through its applicable process.