STC ST00009LB-D
Recorded change: Install and activate Electronic Resource System (ERS) at the First Officer's position. The installation consists of interconnecting wiring, and ERS components. This modification was accomplished in accordance with United Air Lines, DAS-1-WE, Approved Master Drawing List No. 00009 dated August 25, 1997, or later FAA approved revisions. FAA DRS lists ST00009LB-D as Current · Reissued, held by United Airlines Inc, for Boeing DC-10-10. Snapshot dated June 30, 2026.
Recorded modification
What the FAA record covers
ST00009LB-D identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.
Applicability
Aircraft named in FAA DRS
Named aircraft: Boeing DC-10-10. Confirm the approved model list, serial effectivity, configuration, and certificate revision.
Buyer checks
Confirm before sourcing
- Does the approval cover the required model, serial range, and configuration for Boeing DC-10-10?
- Which load analysis, wiring changes, protection, and limitations apply?
- Who can legally supply the design data, kit, instructions, and ICAs?
- What parts, labor, conformity, and return-to-service work are excluded?
Related electrical systems STCs
Regulatory Intelligence
Research aviation evidence
Cited research and approval comparison. Professional adds monitoring and change review.
Keep browsing the free public research library