AeroTEC vs Endeavor Elements for STC planning and PSCP preparation
Consider AeroTEC when the project needs development, design or testing tied to the Project Specific Certification Plan (PSCP). AeroTEC expressly includes PSCP preparation in its development stages. Consider Endeavor Elements when the program needs a focused check of the proposed basis, affected areas, means of compliance and deliverables already identified. Clarify who manages applicant and authority interfaces.
Sources reviewed
Decision criteria
| Decision | AeroTEC | Endeavor Elements |
|---|---|---|
| Write the planning inputs | AeroTEC describes PSCP and test and analysis planning during conceptual work. Ask who owns the plan as it changes. | Review the plan against the proposed modification, intended jurisdictions and affected aircraft areas. |
| Connect tests to evidence | AeroTEC publishes STC examples that include engineering and flight test activity. Confirm planned test partners and scope. | Check that each proposed evidence method has a realizable deliverable and dependency owner. |
| Set the review gates | Agree who schedules the program, prepares packages and manages the response to authority discussions. | Return gaps and a closure sequence tied to the commitments in the plan. |
Separate an approved test plan from a proposed test milestone
Pick an intended test and identify who supplies the conformed article, report, technical review and authority coordination. Check whether the draft PSCP, evidence list and program schedule agree on the event. Flag unassigned or tentative steps before relying on the milestone.