Skip to content

Job-specific comparison · Certification and quality teams

AeroTEC vs Endeavor Elements for conformity preparation

Consider AeroTEC when conformity preparation is part of a larger certification test, modification and engineering program. AeroTEC describes engineering, certification and flight test work and publishes examples of certification flight testing. Consider Endeavor Elements to verify the records tying the test article and test-time configuration to the controlled drawings, especially where rework occurred after initial inspection.

Sources reviewed

Decision criteria

DecisionAeroTECEndeavor Elements
Assign conformity activitiesAeroTEC publishes integrated engineering, testing and certification scope. Confirm who prepares the article, coordinates the conformity inspection and holds any applicable approval authority.Review the records for the test article’s configuration, identity and date against the controlled drawings and test documentation.
Identify test credit riskAsk the program team how interim changes or rework are tracked against the tested configuration.Flag missing dispositions, re-inspection evidence and any breaks in the line from test result to the conformed article.
Keep the final evidence togetherRequest article, inspection and test identifiers in the agreed certification deliverable.Return the gap, source references and closure order for the applicant’s use.

Review the record of a post-inspection rework

If the article was reworked before a ground or flight test, identify what changed, when it changed and which accepted disposition or re-inspection supports the later configuration. Preserve the link to the test result so the authorized reviewer can assess its use.

Discuss the work

STC modifier conformity evidence review

Sources