Skip to content

Category guide · Supplemental type certification teams

Compare STC development and certification support

Buy a combined design and testing engagement when the handoff between hardware, instrumentation and compliance evidence is a programme risk. Buy targeted specialist work when the design lead and test team already exist. In either case, agree the evidence an applicant needs for its programme and establish who will keep the approved design definition, test article and results aligned.

Sources reviewed

Decision criteria

DecisionApproachAcceptance evidence
Develop, modify and testAeroTEC documents aircraft development, integrated ground and flight testing and certification reporting.Define aircraft access, design and test scope, conformity dependencies and delivery of raw and reviewed results.
Lead certification or provide specialist analysisVector documents aerospace certification support and preparation of TC/STC documentation. DMD Solutions publishes specialized aerospace engineering and safety/reliability offerings.Ask each provider for work packages it actually owns and what approvals, other specialists or applicant responsibilities remain.
Coordinate evidence and open findingsEndeavor Elements offers certification planning and recovery support and describes connected requirements, engineering and certification evidence.Ask how changes in the test configuration are reconciled to requirements and how unresolved items return to the applicant.

Require a usable evidence handover

Pick one requirement with a test or analysis planned. Request its verification method, article or model definition, revision of the planned work, associated records and responsibility for claiming compliance. If a supplier is responsible only for an analysis, have them state the interface assumptions clearly enough for the applicant to validate.

The FAA STC process separates showing compliance from the authority’s approval decision. Contract for defined evidence and coordination, with approval roles as applicable to the project.

Discuss the work

Product Lifecycle Management

Sources