Compare STC certification planning and PSCP support

Buy a defined planning deliverable early enough to inform design and test. The plan should say what the changed product is, the proposed certification basis and means of compliance, which tests or analyses are expected and who owns each showing. Match the provider to the complexity of the modification and the work needed beyond the plan.

Sources reviewed

Decision criteria

DecisionApproachAcceptance evidence
Plan design and test togetherAeroTEC explicitly includes PSCP preparation alongside concept design, analysis, prototypes and test planning.Specify the initial and reviewed plan versions, open technical issues, conformity dependencies and engineering/test interfaces.
Coordinate certification and technical inputVector documents establishing requirements and preparing TC/STC materials. JDA advertises STC product certification expertise.Ask which people author the plan, which specialist findings they contribute and who handles communications with the applicant and applicable authority.
Maintain evidence trace through changesEndeavor Elements describes connecting the certification basis, means, evidence and owners in a controlled project record.Ask to review one draft requirement through planned method, deliverable, approval role and version control.

Give bidders a modification whose boundaries are uncertain

Set a briefing around the changed system, interfaces and proposed installation. Ask bidders to show which requirements may be affected, which inputs are still needed and when the applicant must agree the resulting plan with the authority under the applicable project process.

If the design firm and certification specialist split the work, have both use the same list of plan assumptions. Change the record when the design or test configuration changes.