Carry AeroTEC certification evidence into the aircraft lifecycle

Agree which approved documents and effectivity references the receiving party needs, how they identify the actual installation, and where any continued airworthiness instructions and later revisions are controlled. Retain trace from the final verification evidence to the approved change while giving maintainers access to the approved data applicable to their work.

Sources reviewed

Decision criteria

Evidence stageCertification handbackLifecycle record
Approved configurationIdentify the approval, applicable aircraft and controlled drawing or model references.Link to the installation evidence and aircraft identity at embodiment.
Support materialIdentify applicable continued airworthiness instructions or limitations and the authorized access route.Assign the owner for use and revision monitoring and record the source.
Program exceptionsRecord outstanding contractual deliverables and any applicable limitations.Retain clear boundaries between technical work still owed and approved configuration.

Sample a later installation

Choose a second aircraft whose configuration may differ from the test article. Ask the receiving team to retrieve the applicable approval and installation references and to confirm how differences are dispositioned. The appropriate approval and installation authorities retain their decisions.