Compliance matrix management for ODA holders

Use the requirements and configuration tools your project can keep version controlled, then link the matrix to the ODA’s authorized processes and assigned review functions. A requirements or ALM tool can surface which lines are incomplete. A product data system can identify the configuration. The holder needs a separate, reviewable explanation of who made each finding and within what scope.

Sources reviewed

Decision criteria

DecisionApproachAcceptance evidence
Structure requirement coverageJama documents requirement-to-verification relationships, baselines and reviews.Have the programme show a matrix line, method, revision and supporting verification record without confusing an internal approval with an authorized finding.
Test revision and result controlsPolarion documents test evidence, change links and workflow controls.Show what happens to the matrix when a test result changes, including who can record a review or reopen an item.
Relate source data to ODA project oversightTeamcenter documents product change and configuration. EE describes linking ODA projects, records and engineering evidence.Preserve the approved or accepted procedure references, decision scope and role assignment alongside the actual source showing.

Recreate a finding as of its decision date

Pick a closed matrix line from a changed project. Ask a reviewer to recreate the requirement version, associated design definition, authorised reviewer role and actual evidence used at the time. Compare later revisions without overwriting what was reviewed.

Maintain a clear route for issues reserved to the FAA or outside the holder’s authorized functions. Do not use a task completion, signature workflow or imported identifier alone to infer the ODA’s authority.