Conformity evidence preparation for ODA holders

Start from the organization’s delegated functions and project procedures. Assign outside engineering or records preparation work only where the handoff and responsibility are clear. Give the authorized person a controlled item and documentation package for the actual test setup or installation, including changes and unresolved deviations. Escalate anything outside the organization’s authority.

Sources reviewed

Decision criteria

DecisionApproachAcceptance evidence
Prepare test articles and design inputsAeroTEC advertises integrated development, test and certification work. Vector documents configuration audit and technical evidence support.Require current controlled design data and a defined test or installation article. Verify who may inspect, witness, or make a determination for this project.
Get support for procedure and evidence handoffsJDA publishes certification expertise. EE describes ODA project evidence management and certification evidence coordination.Ask the provider to distinguish administrative preparation from any authorized functions. Capture the project identifiers, dates, current defined configuration and unresolved record list.
Preserve the approval boundaryFAA NACIP identifies who can create and distribute its request for conformity using the process.Retain the operative authorization and request, evidence references, disposition owner and what is referred to the FAA as appropriate.

Make a supplier deviation visible before inspection

Take a deviation reported by an outside manufacturer on a part that is about to be inspected. Have the team show exactly which design and test article are affected, who is assigned to review it and whether it can be handled within the ODA’s authorized scope.

A records or technical subcontractor can help make the package complete and ready for review. That relationship does not move the ODA holder’s responsibility or authorize an outside firm to perform a delegated function.