Compare conformity preparation and evidence support

Contract preparation around what needs to conform, the controlled design definition and the evidence required at the inspection or test. An integrated engineering and test provider may prepare several parts of the package. A separate records reviewer is useful where drawings, article identity or deviations are spread across suppliers. Assign any delegated inspection or witnessing only after verifying the applicable authority and limits.

Sources reviewed

Decision criteria

DecisionApproachAcceptance evidence
Prepare the test assetAeroTEC connects engineering, modification, test, and certification services.Agree who records article identity, design data revision, configuration, setup or equipment and changes before any test.
Review configuration and application evidenceVector describes inspections and configuration audits. JDA lists FAA product certification expertise.Confirm whether the proposal is for preparing records, arranging an authorised inspection, or performing one under a verified scope.
Build the evidence handoffEndeavor Elements describes coordinating certification requirements, engineering evidence and review findings.Return an itemized package with controlled design references, supplier records, discrepancies and the assigned decision for each gap.

Practice a late change to the test setup

Have each bidder show what happens if the team swaps a component after the conformity package was assembled. The record should show the change, affected test item and authority or reviewer who must be consulted before relying on the results.

The FAA’s conformity request process identifies specific authorised participants. Preparation and record review can complement them but do not create an authority to approve conformity or determine what the project requires.