Skip to content

Delivery-model comparison · Aerospace product engineering leaders

Enterprise PLM vs aviation certification workflows

Choose enterprise product lifecycle management when the programme needs a governed engineering product definition across systems, suppliers and revisions. Scope aviation certification work when the blocker is getting the right evidence and decisions for an approval milestone. An existing product baseline can remain the source of design truth while the evidence work is carried out alongside it.

Sources reviewed

Decision criteria

DecisionEnterprise PLMAviation certification delivery
Change the product definitionManage engineering models, bill of materials, configurations, access and revisions. Teamcenter also documents aerospace certification and sustainment support.Identify the affected design, compliance basis and open verification or findings. Assign responsibility for the evidence work.
Connect the approved evidenceMaintain controlled links to the requirement, document, version and product structure.Prepare an accountable evidence package tied to the exact design revision and proposed compliance milestone.
Select the first scopeChoose a product change that needs control across multiple design and operations teams.Choose a live finding or test dependency and define what the applicant needs in order to take its next authorized step.

Test one change through both views

Choose a changed equipment installation and ask who owns its design revision, which compliance evidence must be updated, and what the in-service team receives. The design system should retain the controlled definition. The delivery work should return a substantiated decision trail that the programme can use in its authorized process.

Discuss the work

See product and certification work

Sources