Delivery-model comparison · Product certification teams
Requirements management vs managed aircraft certification delivery
Use requirements management when the team can define and perform the work but needs traceability, controlled changes and verification status. Use a managed engineering workstream when requirements are known and evidence is stalled across design review, conformity, testing or findings. Keep the requirements repository as the controlled record and ask the delivery team to return evidence tied to the baseline.
Sources reviewed
Decision criteria
| Decision | Requirements management | Managed certification delivery |
|---|---|---|
| Maintain coverage | Jama Connect documents links from requirements to verification and reviews. Define the governed baseline and naming convention. | Agree the compliance questions and evidence required for a milestone. Assign owners for missing test, conformity or substantiation work. |
| Review a change | Identify affected requirements and verification items and preserve their current versions. | Assess which delivered evidence is still valid for the changed configuration and which work needs updating. |
| Accept the results | Approve the controlled requirement or verification record under the programme's workflow. | Return a reviewed evidence package with its configuration, revision, outstanding findings and next action. |
Work backward from a missing compliance report
Trace a test report to the requirement and the configuration of the test article. If the requirement exists and the report was never produced, better traceability exposes the gap. The programme still needs to assign test planning, execution and review. Ask the delivery team to return the report and any deviations with the same requirement identifiers.