Category guide · Aircraft operators and modification project managers
STC kit sourcing and installation options compared
Buy directly when the STC holder, effectivity, kit contents and installer are known. Use a coordinator when the approved modification, supporting parts, installation slot and final records depend on several suppliers who need a common delivery plan.
Sources reviewed
Decision criteria
| Decision | Approach | Acceptance evidence |
|---|---|---|
| Approval and permission | Confirm the STC identifier, holder, aircraft effectivity, applicable drawings and written permission. | The package identifies its approved scope and the exact data and permission needed to use it. |
| Kit and installer | Check included and excluded parts, revisions, labor assumptions and the installer’s relevant authority and capability. | The quoted installation window is linked to parts availability and outstanding configuration questions. |
| Handover | Specify installation, inspection and release records and any applicable instructions or supplements. | The customer receives the reviewed package and a named owner for any open documentation item. |
Use platforms for the parts and experts for the modification
ILS lists part and MRO capability search. PartsBase describes sourcing tools and PartStore allows buying listed parts. Oliver Wyman Vector advertises technical services relevant to engineering or modification preparation. Ask specifically who will coordinate or perform installation and who will obtain the STC holder’s permission. FAA guidance explains the need for written permission to use another holder’s STC.
Get a coordinated delivery option
Give Endeavor Elements the aircraft model and serial number, current modifications, desired outcome and installation window. Marketplace can scope the kit, supporting parts and proposed authorized installer together and coordinate the agreed work as prime. Request the supplier list, dependencies and record handover. Authorized personnel perform and release the installation.