This review assembles and checks the records an Embraer E-Jet needs to support an export airworthiness approval and satisfy the importing authority's special conditions. It is run when an aircraft is crossing registers, ahead of the export application, by or for the party managing the transfer. It confirms the status summaries the exporting authority will rely on, identifies the importing authority's special requirements, and verifies the supporting records exist for each. You receive an exception list of gaps against the export and import requirements, a source map to the supporting records, and a closure plan sequenced to the export timeline.
When this review is needed
- An E-Jet is crossing registers and the export application has to be supported by a complete records package.
- The importing authority has published special conditions and each one has to be met with evidence before export.
- Status summaries for the exporting authority have to be reconciled to the underlying records ahead of the application.
- A prior export stalled on a records gap and the party wants the package checked before the application is filed.
The problem
An export airworthiness approval turns on records that were built for daily operation, not for a register change, and the two do not always line up. The exporting authority relies on status summaries that have to reconcile to the underlying evidence; the importing authority adds special conditions that the aircraft's records were never organized to answer. On an E-Jet moving between regional markets, the import side often asks for evidence on modifications, repairs, and AD compliance in a form the exporting operator never assembled, and each missing piece stops the application cold.
What gets reviewed
- The status summaries the exporting authority will rely on, reconciled to the underlying records
- The importing authority's special conditions identified and mapped to required evidence
- AD compliance and modification status confirmed in the form the import side requires
- Structural repair and configuration records assembled to answer import questions
- The supporting records located for each element of the export and import requirement
- Outstanding items sequenced against the export application timeline
Scope this review
Tell us the asset, the event, and the evidence in scope, and we will outline a focused first engagement.
Send a representative, redacted record set and we will scope the review.
What gets validated
- Each status summary for the export application reconciles to its underlying records
- Every importing-authority special condition maps to a specific supporting record
- AD compliance is presented in the form the importing authority requires, with evidence
- Modification and repair records answer the import questions without an unfilled gap
- The package accounts for every element of the export and import requirement, open or closed
Evidence normally required
- The exporting authority's export airworthiness requirements for the aircraft
- The importing authority's special conditions and import requirements
- Current AD, modification, and status summaries for the aircraft
- The underlying records supporting each summary
- The delivery timeline the export has to meet
Common discrepancies
- A special condition from the importing authority with no supporting record assembled
- A status summary for the export that does not reconcile to the underlying evidence
- AD compliance held in a form the exporting operator used but the import side will not accept
- A modification or repair the import authority questions with no ready substantiation
What is at stake
A gap against a special condition holds the export until the evidence is produced, and an aircraft waiting on a register change is an aircraft not earning. A status summary that does not reconcile to the records forces the exporting authority to withhold the approval until the discrepancy is resolved, usually on a timeline that the delivery date does not allow. A gap found after the application is filed costs more than one found before, because the clock is already running against a committed delivery.
Move from findings to resolution
Move from findings to a documented resolution path.
How the work runs
Map the two requirements
Set out the exporting authority's export requirements and the importing authority's special conditions side by side.
Reconcile the summaries
Confirm each status summary for the export reconciles to its underlying records.
Answer the conditions
Locate the supporting record for each special condition and each export element.
Sequence the gaps
List the outstanding items and order them against the export and delivery timeline.
What the buyer receives
- An exception list of gaps against the export and import requirements
- A source map tying each requirement and special condition to its supporting record
- A closure plan sequenced to the export application and delivery timeline
Who uses the output
- Asset and transfer teams managing the export against a committed delivery date
- Continuing-airworthiness teams reconciling the status summaries to the records
- Records teams assembling the supporting evidence for each export and import requirement
How the work fits into the transaction or program
The export review sits at the end of the records work for a transferring aircraft, drawing on the AD, modification, repair, and configuration records the earlier reviews confirmed and organizing them to the export and import requirements. It runs ahead of the application so gaps surface while there is still time to close them, and its exception list drives the evidence assembly the export depends on.
Aircraft-specific considerations
E-Jets move readily between regional markets, so a single serial number can face several different importing authorities over its life, each with its own special conditions on modifications, repairs, and AD compliance. Because the aircraft's records were assembled for the market it is leaving rather than the one it is entering, the review treats the import side's special conditions as the primary source of gaps and works back from them to the supporting evidence, rather than assuming the operating records answer them as held.
Jurisdiction-specific considerations
The export approval is issued by the exporting authority and the special conditions are set by the importing one, so the review has to satisfy two regulatory frameworks at once, and an element acceptable to the exporting side may still be a condition the import side imposes. The review maps each requirement to the authority that imposes it, so the package answers both rather than only the register the aircraft is leaving.
Regulatory limits
The review assembles and checks the records that support the export and import requirements. It does not issue an export airworthiness approval, accept the aircraft onto the importing register, or make an airworthiness determination on the authorities' behalf.
What this review does not cover
- Issuing an export airworthiness approval or any certificate
- Accepting the aircraft onto the importing register
- Any airworthiness determination reserved to the exporting or importing authority
Specific to this review
- The export turns on two authorities at once: the exporting side issues the approval and the importing side sets special conditions the records were never built to answer.
- The most reliable place to find gaps is the import side's special conditions, because the aircraft's records were organized for the market it is leaving.
- A gap found after the application is filed costs more than the same gap found before, because the delivery date is already committed and the clock is running.
- A status summary that does not reconcile to the underlying evidence forces the exporting authority to withhold approval until the discrepancy is resolved.
- An E-Jet can face several different importing authorities over its life, each with its own special conditions, so a package that satisfied one export can still fall short of the next.
Sources
U.S. Government (eCFR). Export airworthiness approval requirements and special requirements of an importing authority.
U.S. Government (eCFR). Records an owner or operator must keep, including total time in service, current status of life-limited parts, and AD compliance.
European Union / EASA. EASA design and production certification, STCs, ETSO authorizations, and EASA Form 1 release.
International Civil Aviation Organization. International standards for the airworthiness of aircraft and the framework states use for type and continuing airworthiness.
European Union / EASA. Continuing airworthiness, maintenance records, CAMO responsibilities, and the airworthiness review process in the EASA system.
Frequently asked questions
Our records passed diligence. Why is more needed for export?
Diligence tests the records against a buyer's questions. An export tests them against two authorities: the exporting one issues the approval and the importing one imposes special conditions the records were never organized to answer. The review works from those requirements, which is why records that satisfied a buyer can still leave gaps against the export.
Relevant glossary terms
Related pages
Where this fits
Talk to an engineer who has done this work
We will walk through your current state, the records or evidence involved, and a scoped first engagement.
Talk through the aircraft, records, evidence, deadline, and next useful step.