Skip to content
Engine and powerplant

STC SA3825SW

Recorded change: Installation of a Teledyne Continental Motors IO-470-F engine, fuel system modifications, and a McCauley D2A34C58/90AT-8 (82 dia.), 2A34C66/90AT-8 (82 dia.) or 2A34C50/90A-8 (82 dia.) propeller; or Hartzell BHC-G2YF-1BF/F8468A-2R (82 dia.) propeller as defined in Table I on page 3 of this certificate. OR, Installation of a Teledyne Continental Motors IO-550-D engine, fuel system modifications, and a McCauley D3A34C401/90DFA-8 (Model 182 E, F, G, H, J, K, L, M, N, P, Q, and R) or D3A34C401/90DFA-4 propeller (Model 182P, Q and R only), as defined in Table I on page 3 of this certificate. Data Required: 1. A copy of this certificate and, 2. Item 1, 2, 3 or 4 as defined in Table I on page 3 of this certificate. FAA DRS lists SA3825SW as Current · Amended, held by Peterson Todd and Jo, for Cessna Aircraft 182E, Cessna Aircraft 182F, and Cessna Aircraft 182G, and 9 more aircraft configurations. Snapshot dated June 30, 2026.

Open FAA record
Share
FAA-listed holder
Peterson Todd and Jo
Aircraft configurations
12
FAA revision date
FAA status
Current · Amended

Recorded modification

What the FAA record covers

SA3825SW identifies the approval, recorded holder, named aircraft, and modification scope. It does not confirm kit availability, serial-number effectivity, data rights, price, or installation authority.

Applicability

Aircraft named in FAA DRS

Named aircraft: Cessna Aircraft 182E, Cessna Aircraft 182F, and Cessna Aircraft 182G, and 9 more aircraft configurations. Confirm the approved model list, serial effectivity, configuration, and certificate revision.

Buyer checks

Confirm before sourcing

  1. Does the approval cover the required model, serial range, and configuration for Cessna Aircraft 182E and Cessna Aircraft 182F, and 10 more aircraft configurations?
  2. Which powerplant configuration, limits, instruments, and maintenance data apply?
  3. Who can legally supply the design data, kit, instructions, and ICAs?
  4. What parts, labor, conformity, and return-to-service work are excluded?