Skip to content
All Solutions

For Equipment Suppliers

STCs, TSOs, and a Channel for Distribution

Equipment suppliers run two efforts at once: getting designs certified, and getting them in front of buyers. An STC or TSO moves when the evidence, engineering judgment, and authority-facing work are coordinated and kept on schedule. We do that coordination, then put the approved article in front of the operators and MROs who buy.

Book a call

Most STC delays come from documentation, traceability, and review cycles rather than the engineering itself. CIQ centralizes the certification workspace so requirements, design data, test evidence, and compliance findings stay linked from kickoff through FAA submission.

Where programs stall

Requirements Traceability

Bidirectional traceability across DO-178C, DO-254, ARP4754B, and ARP4761 is where programs lose weeks. Manual matrices drift the moment requirements change.

TSO Authorization Evidence

TSO articles require a Letter of Design Approval, qualification test reports, and continued airworthiness documentation organized to FAA expectations. Surfacing the right evidence is half the work.

Change Impact Analysis

When a requirement, drawing, or test result changes, the downstream impact across design, code, tests, and verification status needs to be visible immediately, not three weeks later.

FAA Coordination

Submission packages, ACO and DER correspondence, and finding closures need to be tracked in a structured way that survives team turnover and program transitions.

What we do

01

Structure the certification baseline

Map your product to the applicable certification basis (Part 23, Part 25, TSO, DO-178C, DO-254, ARP4754B). Generate the initial requirements baseline and means-of-compliance plan.

02

Maintain live traceability

Every requirement traces to design, test, and verification evidence. When something changes, downstream impact is visible immediately.

03

Generate certification evidence

Accelerate preparation of PSAC, SAS, compliance matrices, and TSO submission packages directly from the live workspace.

04

Distribute through the marketplace

Once approved, list the STC or TSO article on the marketplace to reach airlines, MROs, and operators actively sourcing solutions.

Compress STC and TSO timelines by removing the documentation tax
Maintain continuous traceability across DO-178C, DO-254, and ARP4754B
Generate certification evidence in hours
Reach buyers through the marketplace once approved

Next step

Talk to us about your specific workflow.

We'll walk through your current state, the records or compliance footprint involved, and outline a scoped initial engagement.

Book a call